Alright everybody, welcome back.
This one’s the introduction. Article 90. Before you even get into Chapter 1. Before you get into any of the actual chapters. You wanna learn the introduction of the NEC first.
If you’ve watched my other videos this is gonna feel pretty similar to the deep NEC browsing ones. I’m just gonna go through it, break it down, read it, and we’re gonna learn together. Sit back, relax, try to soak some knowledge in with me. I’m trying to learn something along the way too.
Always start with the scope. That’s how I was taught.
This article covers the use, application, arrangement, and enforcement of this Code. It also covers the expression of mandatory, permissive, and non-mandatory text. Provides guidance on the examination of equipment, wiring planning, and specifies the use and expression of measurements.
And for the 2026 book (at least in previous editions) any point .1 of an article is gonna be your scope. So if you go to 110.1, that’s the scope of Article 110. Same thing everywhere.
Covered: This Code covers the installation and removal of electrical conductors, equipment, raceways, signaling and communications conductors/equipment/raceways, and optical fiber cables for:
Public and private premises (buildings, structures, mobile homes, recreational vehicles, floating buildings)
Yards, lots, parking lots, carnivals, industrial substations
Installations of conductors and equipment that connect to the supply of electricity
Installations used by the electric utility (office buildings, warehouses, garages, machine shops, recreational buildings) that are not an integral part of a generating plant, substation, or control center
Shore power to ships and watercraft in marinas and boatyards, including monitoring of leakage current
Installations used to export electric power from vehicles to premises wiring or for bidirectional current flow
Bidirectional current flow = current that can move either direction. Forward then backward. Simple as that.
Big important stuff here:
Often the source of supply is the serving electric utility. The point of connection is the service point. Conductors on the premises side of the service point are service conductors.
Standalone systems (generator, battery, PV, fuel cell, wind turbine, or combination) are not service conductors — those are feeders. Service conductors only come from a utility source.
Not Covered:
Ships, watercraft other than floating buildings, railway rolling stock, aircraft, automotive vehicles other than mobile homes and RVs
Underground mines and self-propelled mobile surface mining machinery and its attendant electrical trailing cables
Railway installations used exclusively for generation, transmission, distribution, etc. of power for rolling stock, or exclusively for signaling and communication
Communications equipment under the exclusive control of communications utilities (outdoors or in building spaces used exclusively for that)
Installations under the exclusive control of an electric utility (service drops or laterals and associated metering, utility-owned or leased property, easements, rights-of-way, certain written agreements on federal land, Native American reservations, military bases, etc.)
The Code is real clear about where it stops and the utility / NESC starts. That’s why knowing the service point matters so much.
The purpose of this Code is the practical safeguarding of persons and property from hazards arising from the use of electricity.
This Code is not intended as a design specification or an instructional manual for untrained persons.
It’s a Code. Not a how-to manual. Not a design guide. A lot of people get that mixed up.
This Code contains provisions considered necessary for safety. Compliance therewith and proper maintenance will result in an installation that is essentially free from hazard… but not necessarily efficient, convenient, or adequate for good service or future expansion.
Hazards often happen because people overload systems or don’t follow the Code, or the original install didn’t leave room for growth.
The requirements address the fundamental principles of protection for safety in IEC 60364-1 Section 131. Protection against electric shock, thermal effects, overcurrent, fault currents, and overvoltage.
Chapters 1 through 4 apply generally.
Chapters 5 through 7 (and 8) can supplement or modify Chapters 1–4.
Chapter 9 is the tables.
Informative Annexes are not part of the requirements — they’re just extra info.
That’s the hierarchy. Keep it in your head.
This Code is intended to be suitable for mandatory application by governmental bodies that exercise legal jurisdiction… and for use by insurance inspectors.
Everything is subject to the approval of the Authority Having Jurisdiction (AHJ).
The AHJ is the one who interprets the rules, decides on approval of equipment and materials, and can grant special permission.
By special permission they can waive specific requirements or allow alternative methods if equivalent safety is maintained.
And if a new product or construction required by the new Code isn’t available yet, the AHJ can let you use what complied with the previous edition that was adopted.
Mandatory rules = “shall” or “shall not”
Permissive rules = “shall be permitted” or “shall not be required”
Permissive does not mean you have to do it. It means it’s allowed. A lot of people mess that up.
Informational Notes and Informative Annexes = extra information only. Not enforceable.
Table footnotes are part of the table and are enforceable (unless they specifically say informational note).
There are formal interpretation procedures if you need uniformity. You can look those up in the NFPA regulations.
Basically, if the equipment is listed by a qualified testing laboratory, you usually don’t have to open it up and inspect the factory wiring at installation time (unless something looks altered or damaged).
Plan for the future. Leave space. Leave spare raceways. Put your distribution centers where people can actually get to them.
Limiting the number of circuits in a single enclosure helps minimize the damage if something shorts or grounds out.
SI units first, then inch-pound in parentheses.
Hard conversion is the normal rule. Soft conversion is allowed in specific cases (trade sizes, extracted material, industry practice, or when hard conversion would hurt safety).
Compliance with either system is fine.
That’s Article 90.
Pretty straightforward once you slow down and actually read it. This is the foundation everything else sits on.
If I missed something, said something wrong, or you want me to dig deeper on any part — drop it in the comments. Especially if you’re a master or a real Code guy (Paul, if you’re out there… call me out). I’m still learning too.
I’ll have a little conversion chart and some notes up on the site as well.
Until next time.
Stay safe, keep the Code open, and keep learning with me.