🎬 NEC 2026 ARTICLE 120 SERIES
PART 4 OF 30 — NEC 120.7 | POWER CONTROL SYSTEMS (PCS)
NEC 120.7 EXPLAINED ⚡
HOW PCS CHANGES LOAD CALCULATIONS
joshthesparky4 · Josh The Sparky
⚡ OPENING HOOK
A Power Control System changes how you calculate loads...
But only if it meets strict NEC rules. ⚠️
🧠 CORE IDEA
⚡ A Power Control System (PCS) actively monitors electrical loads and controls equipment to prevent overload conditions.
Instead of assuming all loads operate at full demand simultaneously, the NEC allows PCS-managed systems to reduce calculated load values—under strict conditions.
Think of it as smart load control...
With Code enforcement behind it.
⚡ CODE CONNECTION
Before a PCS can be used in load calculations:
✅ It must comply with NEC Article 130 requirements
✅ Control settings must be established by qualified persons
✅ It must be properly listed, installed, and used per NEC rules
A PCS is NOT just automation.
It is a listed load management system with safety limits.
⚡ THE 80% RULE
PCS control settings are limited to:
⚡ 80% of the rating of the overcurrent protective device (OCPD)
Example:
🔌 100A breaker
⬇️
⚡ Maximum PCS setting = 80A
This ensures the system has a built-in safety margin before protective devices operate.
📌 CORE TAKEAWAY
⚡ PCS systems actively manage load demand.
⚡ They can only be used in calculations when properly listed and installed.
⚡ Control settings are limited to 80% of the OCPD rating.
⚡ FINAL LINE
Smart systems don’t bypass protection...
They work inside it. ⚡
#NEC120 #Article120 #PCS #PowerControlSystem #LoadCalculations #Electrician #ElectricalCode #CodeStudy #ElectricianLife #NEC2026