🎬 NEC 2026 ARTICLE 120 SERIES
PART 8 OF 30 — NEC 120.7(C)(2) | NONCONTROLLED LOADS WITH PCS
NEC 120.7(C)(2) EXPLAINED ⚡
DON’T FORGET THE REST OF THE BUILDING
joshthesparky4 · Josh The Sparky
⚡ OPENING HOOK
A PCS doesn’t change everything...
And this is where people get it wrong. ⚠️
🧠 CORE IDEA
⚡ Even when a Power Control System is installed, not all loads are controlled.
NEC 120.7(C)(2) makes it clear:
Noncontrolled loads are still calculated normally.
No reductions.
No substitutions.
No PCS adjustments.
⚡ CODE CONNECTION
NONCONTROLLED LOADS:
❌ Not reduced by PCS
❌ Not replaced by control settings
❌ Not modified by system monitoring
✔ Must be calculated using standard NEC Article 120 rules
The PCS only affects what it actually controls—not the entire electrical system.
🧠 REAL-WORLD EXAMPLE
A typical service may include:
🔌 EV chargers (PCS-controlled)
💡 Lighting
🖥️ Receptacle loads
❄️ HVAC systems
⚡ The PCS may reduce EV charging demand...
But:
💡 Lighting = full calculated load
🖥️ Receptacles = full calculated load
❄️ HVAC = full calculated load
Unless another NEC rule allows adjustment, nothing changes for these loads.
📌 CORE TAKEAWAY
⚡ PCS only affects controlled loads.
⚡ Noncontrolled loads are always calculated using standard NEC rules.
⚡ A PCS is not a system-wide reduction tool.
⚡ FINAL LINE
Just because a PCS is installed...
Doesn’t mean the whole building gets a discount. ⚡