Episode 10
Here's a fact that can trip people up:
The more lighting load a building has, the smaller the percentage that may actually count toward the calculated demand load.
Let's look at Table 120.45 and how its demand factors work.
Demand factors apply to the general illumination portion of the calculated load.
These demand factors do not determine how many branch circuits are required.
They affect the calculated feeder/service load.
Think of it as a demand calculation adjustment — not a reduction in the actual connected lighting load.
Table 120.45 applies the following demand factors:
General Lighting Load
Demand Factor
First 3,000 VA
100%
3,001–120,000 VA
35%
Over 120,000 VA
25%
As the calculated lighting load increases, the demand factor applied to the additional load decreases.
The entire connected lighting load isn't assumed to be operating at its maximum demand simultaneously.
For hotels and motels without tenant cooking, Table 120.45 provides:
General Lighting Load
Demand Factor
First 20,000 VA or less
60%
20,001–100,000 VA
50%
Over 100,000 VA
35%
For warehouse storage areas:
General Lighting Load
Demand Factor
First 12,500 VA or less
100%
Over 12,500 VA
50%
If the occupancy isn't one of the categories specifically addressed by Table 120.45:
100%
No demand-factor reduction is provided by this table.
Here's the part that's easy to miss.
The hotel/motel demand factors of:
60% → 50% → 35%
do not apply to feeders or services supplying areas where the entire lighting load is likely to be used simultaneously.
If an entire ballroom is being used for a wedding reception and all of the lighting is expected to operate at once, applying a demand-factor "discount" wouldn't make sense.
The lighting demand is actually expected to be there.
According to Table 120.45, what demand factor applies to the portion from 3,001–5,000 VA?
A) 100%
B) 60%
C) 35%
D) 25%
👇 What's your answer?
C) 35%
The first 3,000 VA is subject to the 100% demand factor.
The portion from 3,001 through 5,000 VA falls within the next range and is subject to the 35% demand factor.
For the 5,000 VA example:
First 3,000 VA × 100% = 3,000 VA
Remaining 2,000 VA × 35% = 700 VA
Total calculated demand = 3,700 VA
← Back to Article 120 Quick Hits
→ Understanding Load Calculations
→ What Are Noncoincident Loads?
→ How PCS Changes Load Calculations
🧠 Brain Busters — Test your knowledge
❓ Question of the Week — Take the weekly NEC challenge
📖 Tutorials — Go deeper
This Quick Hit is an educational explanation based on the author's understanding of the NEC. It is not a substitute for the official NEC, applicable local amendments, manufacturer instructions, or the determination of the Authority Having Jurisdiction (AHJ).
Always verify the requirements applicable to your specific installation.
The National Electrical Code® and NEC® are registered trademarks of NFPA. JoshTheSparky.com is not affiliated with, sponsored by, or endorsed by NFPA.