NEC 120.7(C) EXPLAINED ⚡
CONTROLLED VS NONCONTROLLED LOADS
joshthesparky4 · Josh The Sparky
⚡ OPENING HOOK
A PCS doesn’t manage everything in a building...
It only manages what it’s designed to control. ⚠️
🧠 CORE IDEA
⚡ NEC 120.7(C) separates loads into two categories when a Power Control System is used:
🟢 Controlled Loads
🔴 Noncontrolled Loads
Each category is treated differently in load calculations.
This distinction is critical when sizing feeders and services in modern systems.
⚡ CODE CONNECTION
🟢 CONTROLLED LOADS
Controlled loads are equipment that the PCS can actively monitor and manage.
Examples include:
⚡ EV chargers
⚡ Electric water heaters
⚡ Battery storage systems
⚡ Other PCS-connected equipment
These loads may be adjusted based on system control logic.
🔴 NONCONTROLLED LOADS
The PCS does not manage noncontrolled loads; it must be calculated using the standard NEC Article 120 methods.
Examples include:
💡 Lighting
🖥️ General receptacles
❄️ HVAC (unless PCS-controlled)
🏠 Other permanently connected loads outside PCS control
📌 CORE TAKEAWAY
⚡ PCS systems only apply to controlled loads.
⚡ Noncontrolled loads are always calculated using standard NEC rules.
⚡ A building load is often a mix of both categories.
⚡ FINAL LINE
A PCS doesn’t change the whole calculation...
It only changes what it controls. ⚡